Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

January 8, 2024

April 7, 2024

US-271

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

US-271, Pocola, OK

Subscribe to View Full Documents

Bridge Rehabilitation Us-271: Over Poteau River, 1.2 Miles West of the Sh-112 Junction Near Pocola. Project Length = 0.165 Miles Counties: Leflore Calendar Days: 90 Days Submit Any Questions or Concerns to the Office Engineer Division via: - Email: Odot-prebid.question@odot.org - Phone: (405) 521 - 2625 Please Include the Words " Pre-bid Question(S)" Along With the Call Order and the Bid Opening Date of the Project in Question in the Subject Line of the Correspondence. Unless Otherwise Specified in the Proposal, All Bids Must Be Submitted With a Proposal Guaranty Equal to 5% of the Bid Total. Bids Submitted Electronically Must Have Their Bid Bonds Verified Electronically Through The Electronic Bidding System. Written Bids Must Have Their Bond Stapled to the Back of the Proposal. In Lieu of a Bid Bond, a Certified/cashier's Check Made Payable to the Oklahoma Department of Transportation May Be Submitted as a Proposal Guaranty. Checks Must Be Delivered to Office Engineer Division Prior to the Bid Opening. Proposal Checks Will Be Held or Returned by the Department as Per Subsection 103.04 of the State Standard Specifications. OKDOT - 130 - Bridge Rehabilitation - Us-271 THE DBE GOAL IS ZERO FOR THIS PROPOSAL. The Oklahoma Department of Transportation(ODOT) and the Oklahoma Turnpike Authority(OTA) ensures that no person or groups of persons shall, on the grounds of race, color, sex, religion, national origin,age, disability, retaliation or genetic information, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination underany and all programs, services, or activities administered by ODOT or OTA, their recipients, sub - recipients, and contractors. To request an accommodation please contact the ADA Coordinator at (405)521-4140 or the Oklahoma Relay Service at 1-800-722-0353. If you have any ADA or Title VI questions email ODOT-adatitlevi@odot.org

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.