Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

September 21, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Palm Bay, FL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Rehabilitate an existing 1,000,000-gallon, pre-stressed concrete ground storage tank. The diameter of the tank is 100 feet. The sidewall depth is 10 feet. The tank shall only be out of service for a maximum period of 75 consecutive calendar days during the rehabilitation. The work under this contract includes, but is not limited to the following: o Pressure wash and clean the interior and exterior of the existing ground storage tank to allow for inspection by the OWNER and ENGINEER. o Repair the exterior wall of ground storage tank, including: o Cracks - approximately 200 LF o Repair interior wall of ground storage tank, including: o Cracks - approximately 200 LF o Repair existing interior roof dome of ground storage tank, including: o Cracks - approximately 200 LF o Spalls - approximately 100 SF E. Miscellaneous work, including: o Backfill foundation where concrete spalling is exposed. o Replace roof access hatch hardware. o Surface prep and re-gel coat dome access hatch. o Rout cracks and apply repair mortar on precast overflows. o Replace / repair loose overflow screens & missing vent screens. o Clean corroded steel ties with wire brush and apply epoxy sealant. o Replace gaskets at both manways. o Repair loosely anchored standoff supports at inlet pipe. o Exterior ladder replacement to meet current OSHA standards. F. Prepare and apply a new coating system to the following items: o Tank exterior walls and dome concrete/shotcrete. o Tank interior exposed pipe and fittings. o Tank interior dome ceiling and 3 feet down the interior wall from the ceiling. G. Clean, fill and disinfect the ground storage tank per AWWA C652. Additional Pre Bid Meeting Note: Bidders may join the pre-bid meeting via Microsoft Teams (audio only). Toll number: 347-378-4680 Conference ID: 304 960 148# Question End Date 8/15/2023 5:00 PM

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.