Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 4, 2023

December 29, 2023

Multiple Locations

Asbestos Abatement, Demolition, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Beaver Dam, WI

Subscribe to View Full Documents

Work for Which Bids Are Asked Includes the Demolition of One Approximately 11,000 Square Foot Building With 4,000 Square Foot Basement, One Approximately 3,300 Square Foot Quonset Hut, and Approximately 50,000 S.f. Of Asphalt Pavement. The Work Will Also Include Abatement of the Following Quantities of Asbestos Containing Material in the Two Buildings; 430 S.f. Of Floor Tile; 70 L.f. Of Roof Tile Flashing; 4,100 S.f. Of Ceiling Texture/covering; 295 S.f. Of Pipe Insulation; and 4,000 S.f. Of Texture on Steel Exterior; as Well as the Removal of the Following Regulated Waste Materials; Light Ballasts, Fluorescent Lightbulbs, Mercury Thermostat, 3 Tvs, 1 Refrigerator, and 2 Central Air Units. Bids Are Also Asked to Include Unit Rates for the Excavation, Loading, Hauling, Landfill Disposal, and Backfilling of Approximately 2,300 Cubic Yards of Petroleum Contaminated Soil That Has Been Identified in the Estimates That Require Weight Instead of VVicinity of the Basement. A Standard Conversion Rate of 1.4 Tons Per Cubic Yard Should Be Used in olume. The Consulting Engineer Will Provide a Soil Profile for the Landfill, Soil Screening Services During the Excavation in Order to Identify and Segregate Contaminated Soils and Will Provide Shipping Manifests for the Transportation of the Contaminated Soils. The Quantity of Contaminated Material May Be Greater Than the Original Estimate if Additional Contamination is Identified During Excavation Activities No Proposal Will Be Accepted Unless Accompanied by a Certified Check or Bid Bond Equal to at Least 5% of the Amount Bid, Payable to the Owner as a Guarantee That, if the Bid is Accepted, the Bidder Will Execute and File the Proper Contract and Bond Within 15 Days After the Award of the Contract Owner Reserves the Right to Waive Any Informalities or to Reject Any or All Bids

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects