Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 16, 2023
September 15, 2023
No Information to Display
Multiple Locations
Renovation
No Information to Display
$60,000.00
Public - City
Multiple Locations, Cleveland, TN
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Installation of comprehensive fire suppression systems in two data centers. Cleveland Utilities reserves the right to waive all formalities and informalities in any bid received, to reject any and all bids for any reason whatsoever and to accept any bid which in its opinion may be in the best interest of Cleveland Utilities. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. If you have any questions or require further clarification regarding this project or the bidding process, please contact Andrew Phillips at 423-478-6282 or email aphillips@clevelandutilities.com Scope of Work: a. Conduct a thorough assessment of our facility to determine the most suitable fire suppression system, considering the nature of our operations, facility layout, and local fire safety regulations. b. Develop detailed design plans and engineering drawings for the fire suppression system, including clean agent system, fire alarms, smoke detectors, emergency lighting, control panels, and any other necessary components.Procure high-quality fire suppression equipment and materials from reputable manufacturers. d. Install and connect the fire suppression system, ensuring compliance with applicable codes and standards. e. Conduct comprehensive testing and commissioning of the system, including performance checks, flow testing, alarm system verification, and functional testing. f. Provide comprehensive training to our staff on the proper use and maintenance of the fire suppression system. g. Submit all necessary documentation, including as-built drawings, equipment manuals, and warranties. h. Obtain the required permits and approvals from local authorities
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Cleveland, TN
Bid Date: May 18 2023
Cleveland, TN
Bid Date: Aug 01 2023
Cleveland, TN
Bid Date: Aug 17 2023
Cleveland, TN
Bid Date: Aug 17 2023
Cleveland, TN
Bid Date: Sep 05 2023
Cleveland, TN
Bid Date: Aug 22 2023
Cleveland, TN
Bid Date: Aug 24 2023
Cleveland, TN
--
Cleveland, TN
--
Cleveland, TN
Bid Date: Aug 22 2023
Cleveland, TN
Bid Date: Aug 09 2023
Cleveland, TN
Bid Date: Aug 03 2023
Cookeville, TN
Bid Date: Jul 25 2023
Maryville, TN
Bid Date: Sep 07 2023
Collierville, TN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
