Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 4, 2023

August 30, 2023

September 6, 2023

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, Brevort Township, MI

Subscribe to View Full Documents

Bid date is cancelled GAOA Hiawatha NF Helical Pile Installation - Taylor Creek Trail Bridge 1 SCOPE OF CONTRACT The Contractor shall provide any and all mobilization, equipment, labor, supplies, tools, supervision, transportation, materials including safety and other incidentals necessary to design, furnish, and install four each helical piles for the new Taylor Creek Trail Bridge, per these specifications and the attached documents. 2 PROJECT LOCATION The project is located on the Eastzone of the Hiawatha National Forest, Mackinac County, Michigan. The bridge is on the North County Trail (NCT), about a 2 mile hike to each end of the bridge, coordinates 46.08349, -84.88680. Access to the West side of the bridge is via M-123 and then East on the NCT. Access to the East side of the bridge is via Forest Road (FR) 3122 (Kenneth Road), South on FR3751, then West on the NCT. The trails will be cleared and graded by the Forest Service allowing access for the helical pile driving machine (skid steer or mini excavator). No other vehicles will be allowed on the trails. The Forest Service will transport the Contractor's other materials including helical piles and small tools to the sites with 4-wheelers and trailers. The Contractor's workmen will need to hike the trails to the locations or use Contractor supplied 4-wheelers or side-by-sides. 3 MAGNITUDE OF CONSTRUCTION PROJECT Question Deadline 07/27/2023 Between $25,000 and $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects