Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 6, 2023
March 6, 2024
March 13, 2027
300 S 4th St
Renovation
No Information to Display
$20,000,000.00
Public - Federal
300 S 4th St, Minneapolis, MN
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The General Administration (GSA) Excellence Program seeks to commission architects, engineers, and construction professionals to maintain and modernize our legacy federal buildings for the next 50 to 100 years of service. These are to demonstrate the of integrated that balances historic significance with current needs; balances aesthetics, cost, constructability, and reliability; and creates environmentally responsible and superior workplaces for civilian federal employees. Deadline 10/20/2023 When completed, please send a scanned or electronic copy of the questionnaire to the following e-mail address: jennifer.styzek@gsa.gov In this context, GSA announces an opportunity for and Construction Excellence in public architecture for of Architectural and Construction in accordance with GSA quality standards and requirements. As required by law, regulation or Executive Order, all facilities will meet targets and security requirements. The GSA intends to a (DB) contract for the Diana E. Murphy U.S. Courthouse Elevator & Escalator Modernization Project in Minneapolis, Minnesota, pursuant to the Federal Acquisition Regulation (FAR) Two-Phase Selection Procedures (FAR Subpart 36.3). The of work includes all labor and materials required to provide , , construction, and other related necessary to modernize the existing escalators, as well as the passenger and freight elevators. The contractor should also have extensive experience with working in a fully occupied building. The basic modernization items to include, but are not to the following: o Solid State drives to replace existing motor generators. o New microprocessor destination based electronic controllers. o Door operators, wiring, safeties o Lighting and fan power reduction o Hoistway refurbishment including hoistway lighting, guide shoes, and roller guides replaced. o New machine room control systems, operating panels, feeder cables o Elevator cab ceilings and lighting systems o Operational safety feature upgrades to comply with current building codes o Machine room piping and roof drain modification if necessary due to new equipment o New sump pumps or drainage in elevator pits o Hazardous material abatement as necessary o Replacement/refurbishment of all parts of the escalator, while maintaining the existing truss The DB contract will be procured by competitive negotiation using a two-phase selection procedure (FAR 36.2). A DB contract will be issued for a revised concept , Development Phase, and Construction Documents Phase , as well as all construction work and any/all required specialty construction work. For this contract process, GSA will issue a solicitation consisting of Phase I and Phase II, respectively. The purpose of Phase I (the request for qualifications) is to select the most highly qualified Offerors from Phase I to participate in Phase II (the request for proposals). At the conclusion of Phase I, GSA will invite the Short-Listed Offerors to submit Phase II proposals. Phase II proposals will require of technical and price proposals, which are evaluated separately in accordance with FAR Part 15. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase I "short-list" on SAM.gov. A maximum of three (3) Offerors will be selected to proceed to Phase II. At the conclusion of Phase II, GSA intends to a contract to a Offeror for all and construction . Options may be presented when the Request for Proposal (RFP) is released. This contract will be a total small business . is anticipated in June of 2024 with substantial completion anticipated in June of 2027. The estimated cost range is between $10,000,000 and $20,000,000. This is a negotiated, best procurement. The contractor is to provide all management, supervision, manpower, equipment and supplies necessary for this project. The Request for Proposal is planned to be issued in September of 2023. Any questions regarding this notification should be directed to the Contracting Officer whose name appears herein. Potential offerors will be responsible for downloading the solicitation and monitoring the website for amendments, if any, to the solicitation. Questions Regarding Phase 1 Submit all questions regarding the Phase 1 to the Contracting Officer on or before October 20, 2023. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the Solicitation. Requirements (Phase 2 Requirements) If a bid guarantee is required to be submitted with your offer, any contract awarded will require a and as specified in the Agreement. Offerors who utilize individual sureties should note the requirement for a certified, audited, financial statement for each person acting as an individual surety under clause FAR *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Minneapolis, MN
Bid Date: Oct 19 2023
Minneapolis, MN
Bid Date: Sep 20 2023
Minneapolis, MN
Bid Date: Nov 16 2023
Minneapolis, MN
Bid Date: Nov 07 2023
Minneapolis, MN
Bid Date: Oct 05 2023
Minneapolis, MN
Bid Date: Oct 20 2023
Minneapolis, MN
Bid Date: Oct 05 2023
Minneapolis, MN
Bid Date: Oct 05 2023
Minneapolis, MN
Bid Date: Oct 31 2023
Minneapolis, MN
Bid Date: Nov 07 2023
Minneapolis, MN
Bid Date: Oct 18 2023
Minneapolis, MN
Bid Date: Oct 18 2023
Minneapolis, MN
Bid Date: Oct 18 2023
Minneapolis, MN
Bid Date: Oct 31 2023
Minneapolis, MN
Bid Date: Sep 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
