Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

September 7, 2023

September 1, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Bedford, TX

Subscribe to View Full Documents

The construction of water main improvements in Joiner Acres Addition (Russell Lane) in the City of Bedford. The water portion consists of the installation of approximately 10 linear feet of 12" AWWA DR-(18), C900 PVC water pipe, 4,341 linear feet of 8" AWWA (DR)-18, C900 PVC water pipe, and 53 linear feet of 6" AWWA (DR)-18, C900 PVC water pipe. The sewer portion includes 946 linear feet of 8" SDR 26 (PS115) PVC sanitary sewer pipe and all incidental work as indicated on the plans. Along with Bell Manor Units 1-5 and Forest Ridge No. 2 Addition in the City of Bedford. The water portion consists of the installation of approximately 10 linear feet of 20" AWWA (DR)-18, C905 PVC water pipe, 109 linear feet of 12" AWWA DR-(18), C900 PVC water pipe, 11,171 linear feet of 8" AWWA (DR)-18, C900 PVC water pipe, 866 linear feet of 6" AWWA (DR)-18, C900 PVC water pipe, 11 linear feet of 4" AWWA (DR)-18, C900 PVC water pipe. The sewer portion includes 110 linear feet of 6" SDR 26 (PS115) PVC sanitary sewer pipe by open cut, 2,448 linear feet of 8" SDR 26 (PS115) PVC sanitary sewer pipe, 28 linear feet 6" AAWA C900, (DR-18) PVC sanitary sewer pipe by open cut, and all incidental work as indicated on the plans A cashier's check or acceptable bidder's bond payable to the City of Bedford, Texas in the amount of not less than 5% of the largest possible total for the bid submitted, must accompany the bid. In the case of ambiguity or lack of clearness in the prices of the proposal, the City reserves the right to accept the most advantageous contract thereof to the City, or to reject the proposal. The City reserves the right to reject any or all bids and waive any or all informalities. No bid may be withdrawn until the expiration of ninety days (90) from the date the bids are opened. Question Deadline 07/27/2023 at 1:00 PM CT Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of Contractors obligations under the Contract. be Substantially Complete within 360 calendar days from the date established in the Notice to Proceed. TWDB SWIFT PROGRAM NUMBER 51016 - CID 13

45 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.