Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 25, 2023

August 25, 2023

November 23, 2023

W Cheyenne St

Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

W Cheyenne St, El Reno, OK

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project Title: Repair and upgrade existing pivot irrigation system at the Oklahoma and Central Plains Agricultural Research Center in El Reno, Oklahoma Acquisition is a total set aside for Small Business. Applicable NAICS is 237110 - Water and Sewer Line and Related Structures Construction. The SBA size standard for this NAICS is $39.5M. In accordance with FAR 36.204, the magnitude of this project is between $100,000 and $250,000. See attachments for detailed Statement of Work and solicitation information. A. Project Title: Repair and upgrade existing pivot irrigation system at the Oklahoma and Central Plains Agricultural Research Center in Yukon, Oklahoma B. Acquisition is a total set aside for Small Business. Applicable NAICS is 237110 - Water and Sewer Line and Related Structures Construction. The SBA size standard for this NAICS is $39.5M. C. In accordance with FAR 36.204, the magnitude of this project is between $100,000 and $250,000. D. Vendors shall complete blocks 14, 15, 17 (if applicable), 19 (if any amendments posted), and 20 A-C of this form. E. Vendors are required to be in an 'Active' status in sam.gov at time of proposal submission in accordance with FAR 52.204-7. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractorshall furnish all labor, materials, equipment,supplies, transportation, utilities, and supervision for complete construction of the following in accordance with the clauses, specifications, drawings, attachments, and other terms and conditions set forth in the attached scope of work.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.