Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 1, 2023

October 22, 2023

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Saint Louis, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Library District reserves the right to reject any and all Bids and to waive formalities in the best interest of the Library District. Project (all branches) must be completed by October 22, 2023. Any bidder desiring an explanation or interpretation of this Invitation for Bid must request it in writing no later than 4:00 P.M. C.T. on July 19, 2023, and such request Bridgeton Trails, Natural Bridge, and Weber Road are to be resealed and striped. Daniel Boone and Mid-County are to be striped only. Work at Natural Bridge shall include the parking lot only, not any part of the access drive. 1. Clean, sealcoat, and re-stripe all asphalt driveways and parking areas to industry standards. 2. Clean area to be sealcoated with high power blowers and steel brooms where necessary. The contractor will be responsible for cleaning cracks 3/8" or wider of dirt, debris and vegetation to insure bonding of crack sealing material. Seal these cracks with Craftco Roadsaver PLS or equivalent* hot pourable sealant. 3. Scrub and treat oil spots with oil spot primer to aid the adhesion of sealer to these areas. 4. Apply 2 coats of sand mixed Mac 52 by squeegee at the rate of 0.15 gallon per square yard. Allow sufficient drying time between coats. 5. Other equivalent pavement sealers will be considered but only as an Alternate. Mac 52 must be the Base Bid. 6. Re-stripe to current lot design unless otherwise specified using safety yellow and handicap blue. Re-paint any painted curb or sidewalk edge with safety yellow or handicap blue on pedestrian ramps. The striping should be done within 48 hours of sealcoating (weather permitting). 7. Coordinate all scheduling with Library's Manager of Building Systems. 8. The successful bidder shall be responsible for not disrupting library staff and patrons. All work shall be performed outside of normal Library operating hours. The Library will make arrangements to have parking lot lighting turned on if necessary. 9. Any subcontracting must be clearly noted in the response to the IFB. All insurance and certifications required of the bidder are also required of any subcontractor. The following Scope of Work provides an overview of the terms and conditions being sought by the Library District for the Project: Bridgeton Trails, Natural Bridge, and Weber Road are to be resealed and striped. Daniel Boone and Mid-County are to be striped only. Work at Natural Bridge shall include the parking lot only, not any part of the access drive. Any bidder desiring an explanation or interpretation of this Invitation for Bid must request it in writing no later than 4:00 P.M. C.T. on July 19, 2023, and such request shall be emailed only to shunter@slcl.org.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.