Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 1, 2023

September 1, 2023

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Markham, ON

Subscribe to View Full Documents

Supply and Install Heavy Duty Temporary Construction Fencing & Gates for Off-Leash Dog Park Pilot Project (Various Locations) includes a variety of site dependent Works for the following parks: Ward 1, Cricklewood Park, 7877 Yonge St, Thornhill, ON L3T 2C4 Ward 2, Victoria Square Park, 2929 Elgin Mills Road E, Markham, ON L6C 0H7 Ward 3, Monarch Park, 77 Longwater Chase, Unionville, ON L3R 4A9 Ward 4, Mintleaf Park, 240 Fincham Ave, Markham, ON L6B 1A8 Ward 5, Blodwen Davies Park, 335 Donald Cousens Pkwy, Markham, ON L3P 3J3 Ward 6, Berczy Park South, 432 Wilfred Murison Ave, Markham, ON L6C 0B3 Ward 7, Aaniin Community Centre Park, 5665 14th Ave, Markham, ON L3S 3K5 Ward 8, Ada Mackenzie Park, 185 South Park Rd, Thornhill, ON L3T 0B6 The anticipated Work for this Project may include, but is not limited to the following: - Supply, Delivery & Installation, of New Heavy Duty Temporary Construction Fencing, complete with t-post staking on both sides of each fence panel base, complete with top connections and wire wrapping of every sixth panel; and, - Coordinate timing of work with City. City will provide update layout drawings for installation. - Removal and Delivery of the fencing to 4415 14th Avenue as directed by the City up until the end of the contract. - Any damage incurred on City property as a result of fencing installation will be the responsibility of the fencing contractor (Contractor). Documents can be obtained at: https://markham.bidsandtenders.ca Question Deadline: Mon Jul 24, 2023 5:00 PM (EDT)

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.