Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 11, 2023

May 31, 2024

250 Library Ln

Site Work

No Information to Display

$7,000.00

Public - City

img_map_placeholder

250 Library Ln, Williston, VT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

To surface an existing area of 70x70 and Paint lines to create a basketball court. The contractor is to supply a quote for materials and labor costs to surface the entire area and paint basketball lines to create a basketball court, which has existing hoops on site. The area needs to be surfaced with a product that can stand up to having skateboards, scooters, bikes, roller skates and the like on it Grind, power sand, clean and prime mildew peeled areas with Adhesion Promote or equivalent, as needed. Fill cracks and minor divots with Acrylic Patch Binder or Acrylic Crack Patch, or equivalent, and sand as needed. Shim and sand patched crack areas with 2 coats of Rubberized Acrylic Resurfacer filler coating, or equivalent, as needed. Total area of 70 x 70 to receive 2 coats of SportMaster Acrylic Resurfacer Filler coating, or equivalent. Total area of 70 x 70 to receive 2 coats of SportMaster SkateMaster ColorPlus coating, or equivalent. Color TBD Apply 1 set of regulation white basketball lines approximately- 66x 52 The Town anticipates issuing a letter of intent by August 24, 2023, to be followed as soon as possible by a contract. Completion of the project will be done by Spring 2024. Furnish: The contractor provide and deliver to the site all required materials and supplies. The contractor will pay for all labor necessary to load and unload equipment, materials, and supplies. The contractor is to supply a quote for materials and labor costs to surface the entire area and paint basketball lines to create a basketball court, which has existing hoops on site. The area needs to be surfaced with a product that can stand up to having skateboards, scooters, bikes, roller skates and the like on it.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects