Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

October 2, 2023

December 31, 2023

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Redmond, OR

Subscribe to View Full Documents

The work consists of the alteration of existing buildings at the entry to include an interior vestibule to comply with school district safety protocols. The project does not include site, exterior or envelope alterations to the existing buildings. The following deadlines and restrictions are applicable to the project: Project start date of Date of Notice to Proceed. Contract must meet a Substantial Completion date of December 31, 2023. All bids must be submitted on the proposal forms furnished to the bidders. Each bid proposal shall be submitted ELECTRONICALLY, and the subject line as follows: "REDMOND SCHOOL DISTRICT - DISTRICT WIDE SAFETY VESTIBULES PROJECT" and show the name and business address of the bidder. Each bid must be accompanied by an unconditional cashier's check, certified check or surety bond of the bidder in the amount of ten percent (10%). Unsuccessful bidders will have their security refunded to them when the contract has been awarded. To be considered, such objections or comments must be received at least FIVE (5) working days before the bid closing date. No bid for a construction contract shall be received or considered by the public contracting agency unless the bidder is licensed by the Construction Contractors Board of the State of Oregon as required by ORS 701.035 and 701.055. Each bid must identify whether the bidder is an Oregon resident bidder, as defined in ORS 279A.120. Bidder's attention is directed to compliance with ORS 279C.370 regarding submission of the First-Tier Subcontractor Disclosure Form. If the contract amount exceeds $100,000.00, the First-Tier Subcontractor Disclosure Form will be required and may be submitted either with the bid or within two (2) hours after the bid closing time and date at the bid site address. Failure to provide the First-Tier Subcontractor Disclosure Form may result in bid rejection. The Redmond School District reserves the right to reject any or all bids, to waive formalities, and to postpone the award of the contract for thirty (30) days. All bids and all prices quoted in bids shall be firm for a period of thirty (30) days after the bid closing date.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.