Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 24, 2023

September 22, 2023

October 7, 2023

70th Pl

Paving, Site Work

No Information to Display

$1,498,430.00

Public - City

img_map_placeholder

70th Pl, Bedford Park, IL

Subscribe to View Full Documents

As of August 17, 2023, project was awarded to Unique Plumbing, awarded amount is $1,498,430.19. DESCRIPTION OF WORK: The proposed work is officially known as: 70th PLACE WATER MAIN CENTRAL AVENUE TO LEAMINGTON AVENUE and consists of the installation of a 6-inch, 8-inch, 10 inch and 12-inch water main in trench; pressure connections: fire hydrants; water service reconnections; concrete driveway pavement and sidewalk removal and replacement; class d patching; and all appurtenant construction. Only those Proposals that have been obtained from, and with the approval of, Novotny Engineering will be accepted at the bid opening. C. Only qualified Contractors who can furnish satisfactory proof that they have performed work of similar nature as Contractors will be entitled to receive Plans and submit Proposals. In order to meet this requirement, at the request of the Engineer, bidders will be required to submit a "Statement of Experience" consisting of a list of previous projects of similar nature in order to receive Plans. The Owner reserves the right to issue Bid Documents only to those Contractors deemed qualified. D. All Proposals must be accompanied by a Bank Cashier's Check, Bank Draft, Certified Check, or Bid Bond for not less than five percent (5%) Of the total amount of the Bid, or as provided in the applicable sections of the "Standard Specifications". E. No Bid may be withdrawn after opening of Proposals without the consent of the Owner for a period of sixty (60) days after the scheduled time of opening of Bids. F. The Contractor will be required to furnish a labor and material "Performance Bond" in the full amount of the Contract. G. The Contractor will be required to pay Prevailing Wages in accordance with all applicable laws. This Contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Village in the Proposal and Contract documents. The issuance of Plans and Proposal forms for bidding based upon a pre-qualification rating shall not be the sole determinant of responsibility. The Village reserves the right to determine responsibility at the time of award, to reject any and all Proposals, to re-advertise the proposed improvements, and to waive technicalities.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects