Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

December 13, 2023

C St

Demolition, Paving, Site Work

No Information to Display

$432,800.00

Public - City

img_map_placeholder

C St, Coos Bay, OR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Project is for construction of: Eastside Roads (E Street between 5th Ave. & 2nd Ave., 3rd Ave. between E Street & D Street, and 1st Ave. between D Street & C Street. Work includes the following main items: Cold plane pavement removal, asphalt concrete pavement, full depth asphalt removal, with foundation stabilization, demolition work and other misc. items associated with street rehabilitation. Owner reserves the right to reject any and all bids, and to waive any technicalities or informalities in connection with the bids. . Questions received less than seven (7) days prior to the date for opening of Bids may not be answered The Contractor shall be required to phase the work in order to maintain existing public services and minimize impacts to local residents, other public services, roadway access, travel conditions, and business operations. 2. In low traffic areas the Contractor shall be allowed to re-direct traffic to adjacent roads with local traffic only being permitted to travel thru the construction zone at one-block intervals. Two-way traffic will be allowed at the end of each workday on all streets. 3. Work in residential areas shall be completed during working hours. Working hours are defined as 8:00 a.m. and 6 p.m. Work outside these hours shall be approved by the Owner in writing with 48 hours advanced notice.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects