Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

October 1, 2023

June 1, 2024

Multiple Locations

Site Work

No Information to Display

$2,575,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Revelstoke, BC

Subscribe to View Full Documents

Summit Lake Overhead requires repair work to be performed to ensure it can continue to carry highway legal loads until a major rehabilitation or replacement can be done in approximately five years. The repairs to the bridge include: Ultra-High Performance Concrete repairs to 35 stringer ends, Replacement of 13 deck joints, Concrete deck patch repairs and pier concrete patch repairs. The Site is the Summit Lake Overhead No. 1522 located on Trans-Canada Highway No. 1 and crosses the Canada Pacific Railway approximately 13 km west of Revelstoke, BC. Documents can be obtained from www.bcbid.gov.bc.ca. Construction documents for this project are copyright of the Province of British Columbia.

50 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects