Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 30, 2025

September 11, 2023

No Information to Display

331 Piedmont Dr

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

331 Piedmont Dr, Yanceyville, NC

Subscribe to View Full Documents

Piedmont Community College Caswell Campus Classroom 135 Renovation The project will be done in 1 phase. The project is the renovation of an existing cosmetology space into a new EMS teaching lab. The work consists of the addition of some partitions, new ACT ceilings, new led lighting, redistribution of the existing HVAC supply, new flooring, painting of wall throughout project area, replacing existing entrance storefront, addition of a canopy outside at the entrance, and the addition of privacy curtains at new bed locations.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects