Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 23, 2023

January 31, 2025

To Be Determined

Site Work

No Information to Display

$5,500,000.00

Public - City

img_map_placeholder

To Be Determined, Fairhope, AL

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Work of the project includes, but is not limited to, the restoration and new construction of the Fairhope Municipal Pier parking lot, park, waterfront, and pier. The parking lot will be renovated using approximately 900 tons of asphalt, 5,800 SY of brick pavers, and 3,000 LF of concrete curb. The park will be renovated with new landscaping and irrigation, approximately 3,900 SY of concrete sidewalk, a new restroom building, and associated water and sewer. The waterfront will be renovated with approximately 8,900 SF (face) of modular block seawall. The fountain will be renovated with a new pool and restoration of the existing centerpiece. The pier will be renovated with new handrail and lighting, and the restrooms refurbished. Stairs at the bluff will be replaced with new stairs. . Four hundred thirty-five (435) calendar days are allowed for the construction of the project. A cashier's check or bid bond payable to THE CITY OF FAIRHOPE in an amount not less than five (5%) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and statutory Labor and material Payment Bonds, insurance in compliance with requirements, and verification .

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.