Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

September 13, 2024

Multiple Locations

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Multiple Locations, Carrollton, MO

Subscribe to View Full Documents

Installation of approximately 15,490 feet of water line in Carrollton, MO with new 12-inch, 8-inch, and 6-inch C900 PC235 PVC pipe along with the necessary valves, fittings, hydrants and appurtenances as shown on the design drawings. Project also includes several directional drill installations of HDPE pipe below waterways. Contractor shall locate and expose all line connection locations prior to the ordering or assembling of any dimension specific items. Contractor shall notify Engineer when all connection locations have been exposed and marked. Engineer shall compare proposed locations to those shown on plans and notify Contractor of any changes. Contractor shall locate all utilities, as well as any tile drain pipes in all areas that in any way may be affected by the construction operations. Contractor shall protect all excavated line connection locations to prevent possible injury to individuals or damage to the line. Contractor shall furnish, install and test water lines. Erosion control devices are to be employed to prevent loss of soil and damage to areas adjacent to work. Any damage to adjacent property shall be repaired immediately at the Contractor's sole expense. All repair work shall be approved by the Engineer.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.