Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 8, 2023

No Information to Display

200 I St NE

Renovation

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

200 I St NE, Miami, OK

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Owner reserves the right to reject any or all bids or to waive any minor informalities or irregularities in the bidding. All inquiries during the bid and evaluation process must be directed to the Buyer of Record, The Office of Central Procurement for the OSU and A&M Systems, by phone at 405-744-5984, fax 405-744-5187, email purchase@okstate.edu, or if you are responding to an online solicitation please use the associated Question and Answer Board. All work shall be in accordance with the scope of work or as defined. The Contractor shall follow all applicable City County, State and Federal codes/labor regulations will be responsible for all proper permitting. Safety is a must and will follow all applicable OSHA/Code regulations. Equipment needs furnished for bid: One (1) 160 Nominal ton chiller 208-volt 3-phase, 410a refrigerant. The existing chiller unit is Carrier 30GTN170-S-531C. Unit must be able to interface and function with existing BACnet/LonWorks system. Contractor responsible for all electrical connections to existing electrical service and electrical for heat trace. The contractor shall provide barrel dump valves for draining, heat trace, piping insulation along with new gate valves from flanges to chiller plus any needed modifications or plumbing adapters to new chiller unit. All supplies/parts are to be furnished new/unused meeting all manufacture specifications. The College reserves the right to recover and retain refrigerants and compressors from the existing unit.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects