Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

December 18, 2023

December 31, 2026

505 Shire Pkwy

Site Work

No Information to Display

$20,000,000.00

Public - County

img_map_placeholder

505 Shire Pkwy, Covington, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Newton County Water and Sewerage Authority (Owner) is seeking Proposals from qualified firms interested in providing Construction Manager at Risk (CMAR) services for a project known as the A Scott Emmons Water Reclamation Facility Phase 2 Expansion in Newton County, Georgia (the Project). The Project generally consists of the expansion of the existing water reclamation facility from its current capacity of 1.25 MGD to 2.50 MGD. The major items of work will include construction of two (2) new SBR basins, two (2) new digester basins, a new equalization basin, a new tertiary filtration unit, and all associated pumps, piping, hardware, controls, electrical improvements, and all associated work required for a complete and functional 2.50 MGD water reclamation facility. It is expected that CMAR will provide Preconstruction and Construction Phase Services in collaboration with the Engineer and Owner. The Project scope, design standards and performance requirements are described in more detail in Attachment D (Design Documents and Specifications). GWES will serve as the Project Designer and provide all engineering, design, and construction phase engineering support services to the Owner throughout the duration of the Project. The Owner anticipates being supported by Carter & Sloop as its representative. The total budget for Preconstruction and Construction Phase CMAR services for the proposed facility is currently $20,000,000. Licensing and registration. The CMAR and each other firm included in the Proposal must be licensed in the State of Georgia for the type of work to be performed. Question Deadline 08/04/2023 All questions or comments should be directed to the Owner Contact as follows: Laurie E. Ashmore, PE NCWSA 11325 Brown Bridge Road, Covington GA 30016 Email: la@ncwsa.us Owner reserve the right to Cancel, withdraw, postpone, or extend this RFP, in whole or in part, at any time prior to the execution of the CMAR Contract, without incurring any obligations or liabilities.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.