Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

August 30, 2023

September 4, 2023

304 Jackson Dr

Site Work

No Information to Display

$45,500.00

Public - City

img_map_placeholder

304 Jackson Dr, Havelock, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The first slide gate (SG-3) is at a fifteen-foot depth, with an opening at the top which measures three feet by five feet. This Slide Gate has two Stem Guide Bearings. The Top of the Wall Bracket and Pedestal have become unattached from the anchors that are secured within the concrete berm. The second Slide Gate (SG-4) is at a sixteen-foot depth, with an opening at the top which measures thirty-two inches by six feet. This Slide Gate has three Stem Guide Bearings. The Top of the Wall Bracket and Pedestal have become unattached from the anchors that are secured within the concrete berm. Contractor to verify. This project will include securing the Slide Gate as to not let it move as work is being completed, reattachment of the Top of the Wall Bracket and Pedestal, freeing the Stem Guide Bearings and lubricating, cleaning and inspecting the gates to ensure uninhibited movement and proper seal. This scope of work is not to be extended into a weekend and to be completed within a five-day duration (Monday - Friday), having the bar screen operational on the fifth day. Contractor will also be responsible for scaffolding within both Bar Screen Sumps, ladders will only be utilized for initial entry to begin erection of a scaffold and for exit after all scaffolding has been removed. Scaffolding will conform to all OSHA standards including daily inspections. All Confined Space Entries will also conform to all OSHA standards. The City of Havelock shall not be held responsible for omissions or errors in description. A site visit is highly encouraged before submission of a bid. Disturbance of existing landscape features shall be held to a minimum and all disturbed areas returned to a condition equal or better when repair is complete. Care shall be taken so as not to damage existing features to remain such as roadways, curbs, driveways, sidewalks, etc. All features removed or damaged shall be replaced or repaired to existing condition or better. All demolished material shall become the property of the contractor and shall be removed from the work site and disposed of in accordance with all local, State, and Federal requirements. As-built documentation shall include a description of materials used and repair procedures completed at each site The City of Havelock reserves the right to reject any or all proposals and to purchase items from the state contract in the efforts to award the contract to the bidder it deems to be for the best interest of the City. Questions must be received by 2:00 PM (EST) on Friday, July 21, 2023. If questions are received, the City will respond no later than 12:00 PM (EST) on Tuesday, July 25, 2023. The Contractor agrees to pay the owner $300 per day in liquidated damages for each day beyond the period of performance. The performance period is 5 calendar days from the NTP

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details