Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 11, 2025

September 11, 2023

June 30, 2025

Multiple Locations

Paving, Renovation, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Zumbro Falls, MN

Subscribe to View Full Documents

The work, in accordance with Plans and Specifications prepared by Stantec Consulting Services Inc., consists of the following major items of work, together with erosion control, clearing, grubbing, pavement replacement, turf replacement, site restoration, and other related appurtenances: Construction of a grinder pump pressure sewer collection system, including building sewer, grinder pump stations, pressure sewer service laterals, and pressure sewer forcemain Abandonment of existing subsurface sewage treatment systems Construction of a flowmeter manhole Construction of a receiving manhole Construction of buried septic tanks Construction of a buried equalization tank Construction of buried BioMicrobics, Inc. MyFAST/MyNitriFAST aerobic treatment units Construction of a buried post anoxic treatment system, including denitrification unit dose tank, BioMicrobics, Inc. ABC-N denitrification clarifier unit, and chemical feed equipment Construction of a buried BioMicrobics, Inc. MicroFAST aerobic treatment polishing unit Construction of a buried absorption bed dose tank Construction of a subsurface absorption bed soil dispersal system Construction of buried yard piping Construction of a control building Construction of electrical equipment and control system Project Location: Ryans Bay Road, 400th Avenue, 563rd Street, & 403rd Avenue, Zumbro Falls, Wabasha County, MN. Sunset Bay Road NW, Zumbro Falls, Olmsted County, MN Direct inquiries to Engineers Project Manager, Eric Blasing, at (651) 294-4591 or eric.blasing@stantec.com.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects