Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 7, 2023

February 9, 2024

October 15, 2023

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Hideout, UT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Paving service including highway paving and road paving and infrastructure building services and parking lot and surfacing services Heavy construction machinery and equipment including equipment for paving and earth moving. Roads and landscape material including asphalts and road and railroad construction materials and soil stabilizers and artificial turf and construction aggregates including rock, gravel, and sand Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation. Question Deadline 08/02/2023 at 5:00 PM MT The final completion date for the contractor to complete this project will be October 15th, 2023. Bid security in the form of a certified check, cashier's check or bid bond in the amount of five percent (5%) of the bid shall accompany each proposal. The bid bond will be forfeited if the bidder is awarded the Contract and fails to enter into a Contract with the Owner. Town of Hideout reserves the right to reject any or all bids, waive any informality in a bid or to withhold the Award for any reason Town of Hideout determines. Construction work, in general, consists of the following: City wide roadway improvements including, pot hole repair, crack seal, slurry seal type II, chip seal type C, and asphaltic speed bump installation. The work will include all materials, labor, services, transportation, traffic control, and complete construction and all appurtenances required to complete the project.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.