Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

November 6, 2023

August 2, 2024

NW 18th Ave & NW 71st St

Paving, Site Work

No Information to Display

$2,812,773.00

Public - County

img_map_placeholder

NW 18th Ave & NW 71st St, Gladeview, FL

Subscribe to View Full Documents

**As of October 17, 2023, the award amount is $2,812,772.51. Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations necessary to complete the Work in accordance with the Contract Documents. B. Work includes but is not limited to, milling and resurfacing, road base and surface preparation, pavement and concrete removal, pavement markings, signage, drainage, sidewalks, concrete curb and gutter, traffic calming devices, and street lighting. LICENSE REQUIREMENTS: 1. At the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, Florida and these Solicitation and Contract Documents, the Bidder must hold a valid, current, and active: a. Certificate of Competency from the County's Construction Trades Qualifying Board as a General Engineering Contractor or as a Specialty Engineering Contractor Performance & Payment Bond Required: YES Bid Bond Required: YES SBE-Con. Requirements: YES Percentage: 14.49% SBD Certificate of Assurance Form Required: YES DBE Participation: NO Percentage: 0.00% DBE Subcontractor Forms Required: NO CWP Requirements: YES Percentage: 10.00% SBE-S Requirements NO Percentage: 0.00% SBE-G Requirements NO Percentage: 0.00% Liquidated Damages: YES $$ Per Day: $1,699.00 Calendar Days for Project Completion: 270 Estimated Cost of $1,367,151.87.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects