August 3, 2023
October 2, 2023
July 26, 2025
Multiple Locations
Renovation
No Information to Display
No Information to Display
Public - City
Multiple Locations, Underwood, ND
The Project Includes the Following Work: the Project Consists of Constructing a New Water Tower, Removing the Existing Water Tower, and Installing Water Mains, Ditching, Site Grading, and Surface Restoration. Contract No. Description of Contract 1. Water Tower (Unit Price) 2. Underground and Site Work (Unit Price) Each Bid Must Be Accompanied by a Separate Envelope Containing a Bidder's Bond in a Sum Equal to 5% of the Full Amount of the Bid Executed by the Bidder as Principal and by a Surety, Conditioned That if the Principal's Bid is Accepted and a Contract is Awarded to the Principal, the Principal, Within Ten (10) Days After the Notice of the Award, Shall Execute a Contract in Accordance With the Terms of the Bid and the Bid Bond, and Any Conditions of the City of Lincoln as Required by Law. A Countersignature of a Bid Bond is Not Required. If the City of Lincoln Elects to Award a Contract to the Lowest Responsible Bidder, and the Lowest Responsible Bidder Does Not Execute a Contract Within Ten (10) Days, the Bidder's Bond Will Be Forfeited to the City of Lincoln, and the City of Lincoln May Award the Project to the Next Lowest Responsible Bidder. Each Bidder Must Possess a Valid North Dakota Contractor's License for the Full Amount of Their Bid, as Required by N.d.c.c. 43-07-7. Each Bidder Must Enclose a Copy of Their Contractor's License or Certifi Cate of Renewal, Issued by the North Dakota Secretary of State, in Their Bid Bond Envelope, and Each License Must Be Valid and Dated at Least 10 Days Prior to the Date Set for Bid Opening, as Required Under N.d.c.c. 43-07-12. The Requirements for Bidders and Contractors Under This Regulation Concern Utilization of Minority Business Enterprises (Mbe), Women's Business Enterprises (Wbe), and Small Business Enterprises (Sbe) and Are Explained in the Specifi - Cations. The Goal for Mbe is 2% of the Total Dollar Value of the Project. The Goal for Wbe is 3% of the Total Dollar Value of the Project. Contract 1 - $1,250,000.00 Contract 2 - $1,400,000.00. Contract 1 Water Tower and Site work. Contract 2 Underground. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The value range for this is between $1,250,000 and $1,400,000. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of Contractors obligations under the Contract The Work will be substantially complete on or before July 5, 2025, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before July 26, 2025. Bid Results:- Contract No. 1 Water Tower and Site Work General Construction Services, Inc $1,750,307 Contract No. 2 Water Transmission Line Cofell's Plumbing & Excavating $154500
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Devils Lake, ND
Bid Date: Aug 31 2023
Bismarck, ND
Bid Date: Aug 03 2023
Fargo, ND
Bid Date: Aug 15 2023
Fargo, ND
Bid Date: Aug 16 2023
Velva, ND
Bid Date: Aug 16 2023
Dickinson, ND
--
Fargo, ND
Bid Date: Aug 02 2023
Manning, ND
Bid Date: Aug 02 2023
Minot, ND
Bid Date: Oct 06 2023
Carrington, ND
Bid Date: Sep 07 2023
Grand Forks, ND
Bid Date: Jul 20 2023
Grand Forks, ND
Bid Date: Aug 10 2023
West Fargo, ND
Bid Date: Aug 10 2023
Fargo, ND
Bid Date: Aug 17 2023
Richardton, ND
Bid Date: Aug 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.