Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

October 2, 2023

September 20, 2024

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, L'Assomption, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1744098 Deadline for receipt of complaints: 2023-08-07 Ville de L'Assomption is inviting tenders for Infrastructure Rehabilitation Work on Rue Allard. Without limitation, the work consists of: the organization of the construction site; the implementation of obstruction and detour signage; environmental protection; water management, including the installation of sediment barriers; spraying, levelling and removal of pavement; demolition of concrete curbs, sidewalks and slabs; disposal of excess excavation; excavated material from existing pavement; the installation and maintenance of a temporary water supply system for the duration of the work; culvert demolition; shaping of the pavement foundation; construction of concrete curbs, sidewalks and slabs; leveling of existing paving at connecting joints to existing ones, including disposal of planing residues; cleaning of flat surfaces and installation of a binding binder; asphalt laying; pavement markings; decommissioning/removal of existing sewer lines; cleaning and testing of pipes and structures; commissioning of networks; development and rehabilitation of turf, seeded and stone surfaces; the repair of the premises. The work also includes all related work necessary for the completion of the work according to the plans and specifications. All work is located on the following sections: - Rue Allard - A section of Rue Marcil from Rue Allard - Rue Duval from Rue Allard Duration of work: Start: Fall 2023 Completion: End of summer 2024.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects