Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 28, 2023

September 26, 2023

December 31, 2024

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Knoxville, IA

Subscribe to View Full Documents

In general, the work involves but is not limited to clearing and grubbing, debris removal, neutralization of acidic water, impoundment discharge, excavation, terrace construction, tiling, rip rap placement, soil amendments, erosion stabilization, and seeding. The project includes the following approximate quantities of work: 124 acres of clearing and grubbing, 1,310,000 cubic yards of excavation, 1,500 tons of Class E Revetment, 16,800 feet of terraces, 8,700 feet of drain pipe, 122 acres of seeding, and other appurtenant work normally associated with a coal mine reclamation project. The cost of construction for this project is estimated at $4.1 - $4.7 million dollars. This project shall comply with Davis-Bacon Wage Requirements. Questions concerning the Plans and Construction Specifications should be addressed to Anthony J. Harbaugh, P.E., 515-223-8104. All other questions concerning other Contract Documents should be addressed to Ryan Starkey, Project Coordinator, 515-669-9177. In order to be considered in a final addendum, written questions must be received no later than July 25, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.