Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

October 9, 2023

January 6, 2025

1064 Alleghany Rd

Paving, Site Work

No Information to Display

$1,300,500.00

Public - State/Provincial

img_map_placeholder

1064 Alleghany Rd, Grundy, VA

Subscribe to View Full Documents

The project bid range is $1,150,000 - $1,350,000. The work to be performed under the terms of these Specifications consists of installation of sediment control, access road, diversion ditch if determined necessary, excavation and regrading to establish drilling site, drilling of horizontal dewatering holes and revegetation on the site located at 1064 Alleghany Road, Grundy, VA known as the Alleghany Road Portals Project for the Commonwealth of Virginia. All Inquiries for information should be directed to: jillian.bullock, (276) 455-6979, or by email at: jillian.bullock@energy.virginia.gov The work to be performed under the terms of these Specifications consists of installation of sediment control, access road, diversion ditch if determined necessary, excavation and regrading to establish drilling site, drilling of horizontal dewatering holes and revegetation on the site located at 1064 Alleghany Road, Grundy, VA known as the Alleghany Road Portals Project for the Commonwealth of Virginia. 3.2 The intent of these Specifications is to prescribe the complete work to be performed. The specifications are written to permit and direct the work to be conducted by the Contractor's forces. If there are any contradictions between the Specifications and Drawings, the Contractor shall bring these facts to the attention of the Agency and obtain the Agency's decision as to the true meaning and intention before proceeding. A. The Contractor remains responsible for timely identifying such and any conflicts as may be found to the attention of the Agency. B. In absence of a formal written response from the Agency, or in the event Contractor fails to bring such to the attention of the Agency, Contractor is responsible to have complied with the most stringent requirement

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.