Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 2, 2024

No Information to Display

540 Pier Ave

Demolition, New Construction, Site Work

No Information to Display

$150,000.00

Public - City

img_map_placeholder

540 Pier Ave, Hermosa Beach, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

The project includes, but is not limited to, reconfiguring and improving approximately 300 sf of existing office and record management space which involves demolition/removal of existing partition walls, doors, flooring, parts of electrical and mechanical systems; installation of new partition walls, furred-out walls, a new exhaust fan system, new communications equipment, new light fixtures, new suspended ceiling system, new flooring, new owner-supplied furniture and equipment; painting; and other related work to complete the work per project’s plans and specifications. The project includes, but is not limited to, reconfiguring and improving approximately 300 sf of existing office and record management space which involves demolition/removal of existing partition walls, doors, flooring, parts of electrical and mechanical systems; installation of new partition walls, furred-out walls, a new exhaust fan system, new mechanical and electrical systems, new light fixtures, new suspended ceiling system, new flooring, new owner-supplied furniture andequipment; painting; and other related work to complete the work per project’s plans and specifications. The engineer’s cost estimate for the project is $150,000. License requirement is a valid State of California Contractors License Class “B”. Please submit any questions related to this bid on Planet Bids portal no later than 12 P.M. on Thursday October 19, 2023. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond, each in an amount equal to one hundred percent (100%) of the Contract Price. Each bid must be accompanied by cash or a certified check or a cashier's check or Bidder's bond made payable to the City of Hermosa Beach for an amountequal to at least ten percent (10%) of the bid price The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsive and responsible Bidder

61 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.