Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

September 7, 2023

April 4, 2024

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Troupsburg, NY

Subscribe to View Full Documents

The probable cost for this project is $55,000-75,000. Sealed Bids for the construction of the WWTP UV Disinfection Improvements Project The Issuing Office for the Bidding Documents is: Larson Design Group, 1 West Market Street, Suite 301, Corning, NY 14830, (607) 936-7076. Sets of the Bidding Documents must be obtained from Larson Design Group, 1 West Market Street, Suite 301, Corning, NY 14830, (607) 936-707 Bids will be received for one prime Contract. Bids shall be on a lump sum basis as indicated in the Bid Form. This contract generally consists of the installation of an ultraviolet disinfection system to be retrofitted into the existing dosing tank at the Wastewater Treatment Plant. If a bidder is bidding on multiple contracts, the bids must be submitted separately. Bid security shall be furnished in accordance with the Instructions to Bidders. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of all of Contractors obligations under the Contract. The Work will be substantially completed within 180 days as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 210 days.

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.