Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

No Information to Display

Multiple Locations

Asbestos Abatement, Demolition, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Odessa, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This specification covers the abatement of asbestos hazards from building structures and components listed in these Contract Documents. It is the intent of the Contract Documents to show all of the work necessary to complete the project. All work is to be completed following these specifications and all applicable Federal, State and local rules and regulations. Where a conflict exists between these specifications and/or applicable rules and regulations, the more stringent will apply. 100.1.1 All quantities are approximate and must be field verified by the Contractor. 100.1.2 The Abatement Contractor is responsible for all sampling as required by OSHA, and results will be made available to the Project Manager daily. The Abatement Contractor must give the Project Manager a letter stating exactly how this OSHA sampling is to be accomplished. Texas Consulting Services will provide this monitoring for the contractor at a rate of $150 per day, per 5-man crew. 100.1.3 Pre-abatement air sampling of the designated work area and the adjoining area is to be accomplished by the Project Manager or Consultant. 100.1.4 No pre-abatement work is to start until the Project Manager or Consultant has approved all submittals required in these specifications. 100.1.5 The scope of work for this project includes the removal of the following estimated quantities of asbestos-containing building materials (ACBM). Project site - 700 S. Grant - All of Block 2, less N 0.87-acre tract 712 S. Grant - N 0.87-acre tract of block 2 Odessa, Texas 79761 Lot 13, Block 24, Original Town Subdivision, Ector County 110 North Lee Street Odessa, Texas Asbestos Removal/Demolition

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.