Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

August 8, 2023

September 30, 2023

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Almira, WA

Subscribe to View Full Documents

This Invitation to Bid is intended to solicit bids from Contractors for construction/provisioning of the colocation facilities needed for a Fiber-To-The-Home build in Lincoln County. The Board of Lincoln County Commissioners reserves the right to accept or reject any or all bids. Please be advised that Lincoln County, being a municipal corporation is exempt from Federal excise tax. Dated: Davenport, Washington this 10th day of July, 2023. The County of Lincoln hereby notifies all submitters that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit proposals in response to this invitation and will not be discriminated for or against on the grounds of race, color, sex or national origin, in consideration for an award. Small, Minority- and Women-owned firms are encouraged to submit bids. This project is funded/partially funded through the Washington State Community Economic Revitalization Board with federal funds from the U.S. Treasury ARPA Capital Project Funds. The work on this project includes, but is not limited to the following: o Furnishing all labor, equipment and materials (unless otherwise noted) necessary for the construction of the project o Completing and complying with all permitting as required o Production of as-builts Invitation to bid additional documents: o Almira Colocation Detail Drawings o Creston Colocation Detail Drawings o Harrington Colocation Detail Drawings o Wilbur Colocation Detail Drawings o Colocation Detail Notes by Facility Interpretations and Clarifications 1. Every request for interpretation or clarification should be submitted in writing to: Lincoln County PO Box 28, Davenport, WA 99122 OR janice@lincolnedc.org 2. To be given consideration the request must be received NO LATER THAN 12:00 PM prior to the date fixed for the opening of the bids or proposals. Questions received after this date may not receive a response from the County. C. Oral interpretations or clarifications will be without legal effect..

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.