Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 15, 2023

December 15, 2023

889 Rue Principale

Site Work

No Information to Display

$177,569.00

Public - City

img_map_placeholder

889 Rue Principale, Saint-Sauveur, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

*Award subject to final approval Reference number: 1745009 Deadline for receipt of complaints: 2023-07-28 Ville de Saint-Sauveur wishes to retain the services of a company specializing in the rehabilitation of drinking water reservoirs for the rehabilitation of one of the two cells of the Molson reservoir with the application of sprayed membrane. The Molson drinking water reservoir is located at 889 rue Principale on the territory of the City of Piedmont. The work includes site and surface preparation, temporary dismantling and reinstallation of accessories, protection of bolts and mechanical equipment as well as piping that must remain free of the sprayed membrane, injection of hydrophobic expansive polyurethane, leveling of concrete surfaces, application of NSF/ANSI 61 certified structural epoxy after and spray membrane on all concrete surfaces, maintaining an environment conducive to their cures, maintaining a quality assurance system during work and cleaning the site following the work. The work will be carried out in confined space, the bidder must provide the equipment and certified labour for this purpose. The expected end result of the work is the complete sealing of our tank and the extension of the life of the infrastructure. The work must be carried out continuously and without interruption and must be carried out before December 15, 2023. For any information, email: juridique@vss.ca

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects