Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 8, 2023

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Knoxville, TN

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Knoxville Utilities Board (KUB) will be hosting a bid for 5,000 feet of 8" ductile iron pipe for our water and waste water projects. Ductile iron pipe shall be in conformance with the latest revision of ANSI/AWWA C151/A21.51 Standard. The pipe shall be push-on joint with a minimum pressure class of 350 psi, cement-lined according to ANSI 21.4/AWWA C-104 , and coated inside and outside with asphaltic coating. Ductile iron pipe and fittings shall conform to the requirements of the Materials Specifications herein

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects