Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
July 27, 2023
September 5, 2023
January 31, 2024
Multiple Locations
Site Work
No Information to Display
$1,047,550.00
Public - County
Multiple Locations, Elizabethtown, KY
Contract 2 consists of the installation of new pumps at Lift Stations No.1 and No. 3, installation of an emergency generator at Lift Station No. 1, installation of a new wetwell and pumps at Lift Station No. 2, and associated appurtenances. All bidders shall submit with their bid a Bid Bond in amount of not less than five (5) percent of the base bid. No Bidder may withdraw his bid for a period of ninety (90) days after the scheduled Bid Opening Date. The Bidder awarded the contract shall execute a 100% Performance Bond and a 100% Payment Bond and shall furnish insurance as required, in the General Conditions. The Bidder awarded this contract shall complete this project within 120 calendar days after date of authorization to start work The Water District reserves the right to reject any and all bids and waive informalities This article covers the design and manufacture of ductile iron certrifugally cast on metal molds and ductile iron fittings. Specific Requirements: Ductile iron pipe shall be furnished cement lined unless otherwise noted on the Drawings or in other Sections of these Specifications. Ductile iron pipe shall be furnished with rubber gasket push on joints except as may otherwise be noted on the Drawings or in difficult working areas and with approval of the Engineer. If indicated, restrained joints may be required. 1. Pressure class shall be at least 250 psi for pipe sizes 20 inches or smaller and pressure class 200 psi for pipe sizes larger than 20 inches for mechanical and push on joint pipe. 15 2. Thickness design of ductile iron shall conform in all aspects to the requirements of ANSI/AWWA C150/A 21.50 latest revision. 3. Manufacture and testing of ductile iron pipe shall conform in all aspects to the requirements of ANSI/AWWA C151/A 21.51 latest revisions.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Elizabethtown, KY
Bid Date: Aug 17 2023
Elizabethtown, KY
Bid Date: Aug 08 2023
Elizabethtown, KY
--
Elizabethtown, KY
Bid Date: Apr 28 2022
Elizabethtown, KY
Bid Date: Jan 27 2022
Elizabethtown, KY
Bid Date: Jan 27 2022
Elizabethtown, KY
Bid Date: Feb 19 2021
Elizabethtown, KY
Bid Date: Feb 12 2021
Greenup, KY
Bid Date: Aug 24 2023
Mount Olivet, KY
Bid Date: Aug 24 2023
Provo, KY
Bid Date: Aug 24 2023
Mckee, KY
Bid Date: Aug 24 2023
Frankfort, KY
Bid Date: Aug 24 2023
Stanford, KY
Bid Date: Jul 26 2023
Frankfort, KY
Bid Date: Aug 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
