Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 18, 2023

March 9, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$810,715.00

Public - County

img_map_placeholder

Multiple Locations, Pensacola, FL

Subscribe to View Full Documents

Question Submission Deadline:July 28, 2023, 3:00pm This work includes clearing of all hurricane debris, remove damaged existing culvert pipes and riprap, install a new pipe/box culvert with appropriate end treatments, restabilize and reconstruct the roadway pavement and replace riprap within the ditch bottom. Minor ditch regrading, resetting existing fence and installing concrete ditch pavement will be required. All improvements shall meet erosion protection requirements as documented in the project construction plans and design documentation. Licensees / Certifications General Contractors License or Underground Utilities License Work Zone Safety Traffic Supervisor Certifications Certified Stormwater Management Inspector The County reserves the right to waive informalities in bids to reject any or all bids with or without cause and accept the bid that in its judgment is in the best interest of the County. Notice is hereby given that the Escambia County Board of County Commissioners will receive sealed bids for a General Contract for the replacement of the cross-drainage structures located at 7200 and 8000 McElhaney Road in Century, FL. Only properly licensed Contractors are invited to bid. This work includes clearing of all hurricane debris, remove damaged existing culvert pipes and riprap, install a new pipe/box culvert with appropriate end treatments, restabilize and reconstruct the roadway pavement and replace riprap within the ditch bottom. Minor ditch regrading, resetting existing fence and installing concrete ditch pavement will be required. All improvements shall meet erosion protection requirements as documented in the project construction plans and design documentation.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.