Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

August 5, 2024

November 30, 2026

I-69

New Construction, Paving, Site Work

No Information to Display

$201,655,622.00

Public - State/Provincial

img_map_placeholder

I-69, Evansville, IN

89

12

118

4

Subscribe to View Full Documents

*As of September 24, 2024, preliminary construction work for this project started around 2 months ago. The main bridge work will start in 2026, and the project as a whole will also be completed that year. The embankment portion of this project is expected to start in the Fall of 2024, and the main construction of the bridge not until much later. Contract : B -44119-A Project Control No. 2101318 2201152 2201154 2201156 Federal/State No. 2101318 2201152 2201154 2201156 Location New Bridge Approach Vanderburgh County - on I-69 From Ky Sl to 0.6 Mile W of S. Green River Road (Rp 000+0000 to 001+0008) New Bridge Construction I69-000-10744 Prestressed Concrete Bulb-t Beam Vanderburgh County - on I-69s Over Ohio River Floodplain, 1.50 Miles E of Us 41 New Bridge Construction I69-002-10776 Prestressed Concrete Bulb-t Beam Vanderburgh County - on I-69s Over Eagle Creek, 1.20 Miles E of Us 41 (Rp 000+0000 to 000+0054) New Bridge Construction I69-002-10778 Prestressed Concrete Bulb-t Beam Vanderburgh County - on Ramp From Vmp to I-69s Over Eagle Crk, 1.14 Mi E of Us 41 (Rp 001+0054) Qualifications: A(A) D(B) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 101 - New Bridge Construction - I-69 COMPLETION DATE 11/30/2026

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.