Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 8, 2023
September 8, 2023
No Information to Display
10 Garrison Ave
Renovation
No Information to Display
No Information to Display
Public - State/Provincial
10 Garrison Ave, Durham, NH
USNH, representing University of New Hampshire (UNH) Facilities Project Management, is requesting bids for the Paul College 3rd Floor Terrace Roof Replacement. Deadline for written questions 07/21/2023 at 12:00 p.m. Award announcement Week of 08/07/2023 Response to questions by 07/28/2023 SCOPE OF WORK A. Provide labor and materials necessary to remove the designated existing materials and install the new specified roofing and related components for University of New Hampshire, Paul College, 3 rd floor terrace roof replacement. B. SUMMARY OF WORK 1. The work involves removing all designated roofing materials, flashings, insulation, concrete pavers, obsolete units and other related items. 2. The existing structural concrete roof deck will be inspected and repaired, as/if necessary, on a unit price basis (Base bid quantity with additional ADD/DEDUCT pricing). 3. The existing structural steel roof deck will be inspected and repaired, where required, on a unit price basis (Base bid quantity with additional ADD/DEDUCT pricing). 4. The existing plywood blocking will be inspected and, if necessary, replaced on a Unit Price basis (Base Bid quantity with additional ADD/DEDUCT pricing). 5. The existing roof drains will be inspected and, if necessary, replaced on a Unit Price basis (Base Bid quantity with additional ADD/DEDUCT pricing. 6. Preparation involves removal and legal disposal of: a. All existing concrete pavers b. All single-ply roof membrane, flashing, base flashings and accessories. c. All insulation d. All vapor barriers. e. All copper sheet metal parapet cap and flat seam copper roofing. f. All counter flashings and metal aprons designated for removal. g. All designated obsolete equipment. h. All other obsolete equipment as shown on the roof plans RP-101. i. All temporary electrical disconnects and reconnections as required to install proper flashings at each unit. j. All existing drains with inserts, cracked bowls or other damage, or deterioration. k. Any damaged slate and copper edge of steep slope roofs above work area. 7. As part of the preparation, walk the entire site and take pictures of all unsatisfactory conditions which include but are not limited to all items to be reused, or site conditions near areas where the work will be conducted. The process shall also be utilized for the onsite foreman to bring forth conditions they feel are not as designed or not capable of being completed. These pictures, with descriptions shall be provided to the Owner and Owner's Representative a minimum of 48 hours prior to the start of work. All items not shown will be considered the contractor's
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Durham, NH
Bid Date: Aug 21 2023
Durham, NH
Bid Date: Jul 10 2023
Durham, NH
Bid Date: Sep 07 2023
Durham, NH
Bid Date: Sep 13 2023
Durham, NH
Bid Date: Jun 30 2023
Durham, NH
Bid Date: Aug 11 2023
Durham, NH
Bid Date: Nov 02 2023
Durham, NH
Bid Date: Jul 28 2023
Durham, NH
Bid Date: Sep 14 2023
Durham, NH
Bid Date: Aug 03 2023
Durham, NH
Bid Date: Aug 25 2023
Concord, NH
Bid Date: Aug 16 2023
Keene, NH
Bid Date: Jun 16 2023
Hudson, NH
Bid Date: Jun 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
