Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 1, 2023

May 1, 2024

4872 Poplar St

Remodeling

No Information to Display

No Information to Display

Public - City

img_map_placeholder

4872 Poplar St, Murray, UT

Subscribe to View Full Documents

Murray City Corporation (City) intends to select a Construction Manager/General Contractor (CM/GC) to provide services for the selective renovation of the Murray Mansion Question Submission Close Date:7/21/2023 5:00 PM MDT Any questions should be submitted in writing Electronically by July 21 at 5:00 P.M. MT If you need more information on this event, please contact: Laura Bown +1 801-264-2663 lbown@murray.utah.gov Fixed Limit of Construction Cost (FLCC): The amount of money committed by the City to complete the Project. The FLCC includes the general conditions construction, CM/GCs Fixed Fee and CM/GCs contingency. The FLCC is $800,000. It is the responsibility of the Design team to design to and the CM/GC to execute the work described in the design to renovate the facility that is equal to or less than the FLCC. The FLCC can only be increased by the Owners approval of a contract change. Achieve substantial completion of the Project by May 1, 2024 Failure to attend a mandatory pre-bid meeting shall result in the disqualification of any bidder that does not have an authorized representative attend the entire duration of the mandatory pre-bid meeting. Contractors will be considered late and will not be allowed to attend the meeting if they arrive after the attendance roll has been signed by all in attendance and the doors to the room are closed. Murray City Corporation reserves the right to accept or reject any or all proposals, or any part of any proposal, to waive any informalities in any proposal as its best interest appear.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.