Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 1, 2024

No Information to Display

2 Eireann Quay

Service, Maintenance and Supply, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

2 Eireann Quay, Toronto, ON

Our team is requesting plans for this project.

Subscribe to View Full Documents

Rehabilitation of the Billy Bishop Toronto City Airport Island East Wall, to the anchored steel sheet pile wall with the raised crest of the wall, for approximately 242m of island dock wall running from the western channel at its north end, to the hydroplane/seaplane ramp to the south. TIMELINE: Request For Proposals has been issued by the owner for Consultants for Coastal Engineering Consultancy to design structural repair, document and provide contract administration of the island dock wall as recommended by a 2023 Condition Study submitted by Shoreplan. Enquiries should be forwarded to the owner prior to August 4, at 5:00:00 PM EDT. ADDENDA The closing date has been extended. Ports Toronto reserves the right to reject a Respondent's Proposal on the basis of information provided by the Respondent's references. The cost of installation of steel sheet pile in front of the existing wall was estimated to be $29,300\ per metre of wall. The total cost of this option along the length of the wall is $6.2M. The cost of installation of the concrete cope wall above elevation 71.5m was estimated to be $39,200 per metre of wall. The total cost of this options along the length of the wall is $9.6M. These costs include a 30% contingency allowance but do not include allowances for design and fish habitat enhancements or HST. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.