Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

October 2, 2023

April 30, 2024

Multiple Locations

Site Work

No Information to Display

$1,510,302.00

Public - County

img_map_placeholder

Multiple Locations, Stroudsburg, PA

Subscribe to View Full Documents

As of October 26, 2023, project was awarded to Telco Inc, awarded amount is $1,510,301.50. This work includes the provision of all materials, labor, and incidental requirements as more particularly described in the bid documents for the 2023 Monroe County Green Light Go Adaptive Signal Control Project. The project consists of installing adaptive signal controls as identified on the Drawings for Construction at 24 intersections in five (5) municipalities. All questions concerning the bid documents or the project in general should be submitted via PennBid no later than 4:30 PM, August 17, 2023. This work includes the provision of all materials, labor, and incidental requirements as more particularly described in the bid documents for the 2023 Monroe County Green Light Go Adaptive Signal Control Project. The project consists of installing adaptive signal controls as identified on the Drawings for Construction at 24 intersections in five (5) municipalities. Bids must be accompanied by a certified check or bid bond issued by a Surety licensed to conduct business in the Commonwealth of Pennsylvania, in the amount of at least 10 percent (10%) of the total bid. All work, except as noted, shall be substantially completed within 152 calendar days after issuance of the Notice to Proceed. Permanent seeding work shall be performed only between April 1st and May 31st or August 31st and October 15th 04/30/2024 (Tues) FINAL COMPLETION DEADLINE .

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.