Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 11, 2023

September 11, 2023

January 9, 2024

510 Park Blvd

Renovation, Site Work

No Information to Display

$1,972,503.00

Public - County

img_map_placeholder

510 Park Blvd, Cherry Hill, NJ

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Softball Field and Parking Lot Improvements at Cooper River Park Question Deadline 07/20/2023 at 12:00 PM ET All Requests for Information (RFI) must be submitted by email to Ms. Jessica Hauber at jessica.hauber@rve.com This project, located within Cooper River Park in the Borough of Collingswood, Camden County, New Jersey, consists of the construction of a new softball field adjacent to an existing parking lot that will undergo improvements located along S Park Drive. Specifically, Base Bid A includes, but is not limited to, the following major components: Demolition of existing softball field, concrete boat ramp, and portions of stone parking area. Construction of a new softball field complete with athletic court benches, fencing, and spectator viewing areas. Construction of new parking lot improvements including replenishing the stone, an asphalt driveway entrance and concrete ADA parking spaces. Construction of new concrete boat ramp. Construction of new concrete sidewalks providing direct connections to the softball field viewing areas and parking area. Construction of asphalt path providing direct connection from the parking area to the existing asphalt path. Installation of new regulatory and warning signs throughout the parking lot. Topsoil and seeding/sodding, landscaping, and irrigation. 1.02 Base Bid B consists of all the above plus a new asphalt parking lot complete with striping. 1.03 The above Scope of Work outlines the general items and shall not be construed as being all inclusive. 1.04 The plans entitled "Softball Field and Parking Lot Improvements at Cooper River Park, Borough of Collingswood, Camden County, New Jersey" are appended hereto and now made a part of these specifications.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.