Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 20, 2023

November 19, 2023

203 E Cherry St

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

203 E Cherry St, Cushing, OK

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Cushing reserves the right to reject any or all bids Completion of said project will be sixty (60) days after execution of contract. Said bids will be received for furnishing all labor and materials to accomplish the removal and disposal of all existing roofing materials and furnish and install new roofing on the building. Remove the existing roof and coatings. Clean the entire roof surface. Seal and leakproof cracks and holes using an Acrylic Latex Caulking Compound. Install a minimum of 1.5 inch of sprayed in place polyurethane foam over the entire roof surface. Topcoat with Acrylic, elastomeric, monolithic roof coating. Roof coating must conform to ENERGY Star Certification for energy efficiency and reflectivity. Remove any drippage of bitumen or adhesive from walls, windows, floors, ladders and finished surfaces that were a result of the installation process. Keep premises free from rubbish at all times and shall arrange his/her material storage so as to not interfere with the Senior Citizen Center daily operations. At the completion of the work, all the unused material and waste shall be removed from the site. The grounds and the building shall be raked and swept clean after work completion

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects