Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

December 14, 2023

January 7, 2026

Multiple Locations

Site Work

No Information to Display

$6,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Savannah, GA

Subscribe to View Full Documents

The work to be done consists of the following generally described items: Consists of drainage structure upgrades with this Casey South drainage Basin. Construction will include the addition and size upgrade of pipe and other drainage structures. This construction also consist of roadway demolition, repair and improvements, and detours. Casey Canal Improvements Phase 2A The work to be done consists of the following generally described items: The proposed project is in the residential area located in the vicinity of 54th, 56th and 57th streets between Abercorn to Harmon streets. It will consist of demolition of the existing streets, construction of new stormwater pipes, manholes and inlets, replacement of 8000 ft existing water mains plus laterals and associated valves/accessories, implementation of erosion control, sampling and reporting during construction and restoration of street pavement. The bids are set up in two phases and five options. (Please see attached exhibit) Phase 2-1: construction along 54th street from Abercorn to Harmon and along Abercorn St. from 55th to 54th Phase 2-1, alternative #1: Micro-tunnel 60" RCP for the most eastern block on 54th between Paulsen to Harmon. Phase 2-2: Construction along 57th from Abercorn to Reynolds, along 56th from Reyolds to Harmon, along Abercorn, Habersham, and Battey from 58th to 57 th and along Reynolds from 58th to 56th. Phase 2-2, alternative #1: use 10x6 box culvert in lieu of double 72" RCP for stormwater pipes. Phase 2-2, alternative #2: micro-tunnel 102" RCP for the most eastern block on 56th street between Paulsen to Harmon.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.