Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 1, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$577,725.00

Public - City

img_map_placeholder

Multiple Locations, Bessemer, AL

Subscribe to View Full Documents

The BESSEMER STREET PATCHING 2023-2024 Project consists of an on-call as needed utility street patching project throughout the City of Bessemer and the Bessemer Water service area. Estimated annual quantities include1,950 tons of 1/2" maximum aggregate size mix of hot-mix asphalt patching and 15,000 square yards of planing existing pavement 0"-2" thick. Project also includes crushed aggregate base course in undercut areas and utility adjustments as needed. Contractor shall adhere to Part 6 - Temporary Traffic Control of the Manual on Uniform Traffic Control Devices (MUTCD), 2009 edition. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Engineer's Bracket Estimate: $700,000 - $775,000 The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner' s judgment, the best interests of the Owner will thereby be promoted. A cashier's check or bid bond payable to City of Bessemer in an amount not less than five (5%) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal along with Non-Collusion Affidavit. A One Hundred Percent (100%) Performance Bond and a One Hundred Percent (100%) Payment Bond and evidence of insurance required in the bid documents will be required at the signing of the Contract.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects