Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 15, 2023

January 15, 2024

August 16, 2024

614 E 5th St

Renovation

No Information to Display

$4,100,000.00

Public - City

img_map_placeholder

614 E 5th St, Benicia, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Removal, replacement, recoating and installation of facilities located in the WWTP Primary Treatment area. Project Description: Removal, replacement, recoating and installation of facilities located in the WWTP Primary Treatment area. The City of Benicia previously invited Bids for the WWTP Primary Treatment Rehabilitation Project in July, 2023. At that time, the apparent low bid exceeded the authorized funds for the project and all bids were rejected. This invitation to Bid is for a similar project under the same project name including the following changes: 1. The original bid package required that bypass pumps be diesel powered. The revised bid package allows for the use of electric pumps (skid-mounted or submersible) which may be powered by City facilities. City will be paying for costs of electricity used by these electric bypass pumps. 2. The original bid package included four bypass locations. The City will now be providing the fourth bypass setup. 3. Revised specification section 03925 includes additional polyurethane coating products as approved equals and modified material requirements to ensure these alternative products could meet specification. 4. Added new scope: removal and replacement of the existing helical skum skimmer and beach for clarifier #1. Location of Work: 614 E. 5th Street, Benicia, CA 94510 The Engineer's Opinion of Probable Costs is approximately $4.0M to $4.1M Completion of Work: All work shall be completed within 214 Working Days for the date when the Contract Time commences to run. Instructions: Bidders shall refer to Document 00 2113 (Instructions to Bidders) for required documents and items to be submitted as set forth in Paragraph 1.01 above. Bid Preparation Cost: Bidders are solely responsible for the cost of preparing their Bids. Reservation of Rights: Owner specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work. Owner may reject any and all Bids and waive any minor irregularities in the Bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.