Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

September 15, 2023

July 30, 2024

Multiple Locations

Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Casa Grande, AZ

Subscribe to View Full Documents

The City of Casa Grande reserves the right to waive any informalities or irregularities in this Request for Bids, or to reject any or all bids; to be the sole judge of the suitability of the materials offered, and to award a contract or contracts for the furnishing of one or more items of the services it deems to be in the best interest of the City. This project is located in Casa Grande, Arizona in the west area of the city. New dual force mains and effluent (RWDS) pipelines are consolidated into one trench along Kortsen Road with installation going under a highway and railroad utilizing Jack and Bore (52" steel casing). The RWDS is a new 21,040 LF pressurized effluent line (24" and 30") routed from the WRF to Bianco Road southwest of the WRF with a new Arizona Pollutant Elimination System (AZPDES) permit for the ability to discharge excess Class A+ effluent to the North Branch of the Santa Cruz Wash and Santa Cruz River. The force main features 13,050 LF of dual 18" HDPE pipeline routed from the new lift station to the existing WRF. In addition, 5,020 LF of 36" HDPE sewer interceptor along Bianco Road will intersect with 2,686 LF of 18" HDPE sewer lateral pipeline along Kortsen Road to combine within a 42" pipe which will convey wastewater to the new lift station. Contractor Question Deadline August 08, 2023

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.