Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

October 14, 2023

Canterbury Dr

Paving, Site Work

No Information to Display

$185,000.00

Public - City

img_map_placeholder

Canterbury Dr, Augusta, GA

Subscribe to View Full Documents

This project consists of replacing approximately 45 linear feet of 30" reinforced concrete pipe that is failing underneath Canterbury Drive. The project will include the replacement of the existing storm sewer culvert with a 42" double barrel high density polyethylene (HDPE) pipe, a precast headwall, a cast in place headwall, saw-cutting, demolition and replacement of approximately 1200 square feet of existing pavement, demolition and replacement of approximately 80 linear feet of curb, gutter and sidewalk, roadway striping where pavement is replaced to match existing striping, erosion control (installation, maintenance, and removal), and permanent stabilization. The City reserves the right to reject any and all Bids, in whole or in part, with or without cause, and to waive informalities, technicalities or irregularities in the Bids or the Contract Documents. Also, this project is of sufficient complexity that the City reserves the right to reject any contractor who does not have previous experience with projects of a similar nature and complexity The City, in its sole discretion, reserves the right to select the Bidder that it deems most advantageous to the City. Time for Performance. The Contractor shall have 30 consecutive calendar days (excluding Sundays and legal holidays) from the date specified in the Notice to Proceed to complete the entire Project.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.