Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 15, 2024

November 18, 2024

August 7, 2025

2021 Transformation Dr

New Construction, Site Work

No Information to Display

$25,000,000.00

Public - Federal

img_map_placeholder

2021 Transformation Dr, Lincoln, NE

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Construct a US Department of Agriculture (USDA), Agricultural Research Service (ARS), research Headhouse and Greenhouse facility at the Nebraska Innovation Campus (NIC), University of Nebraska , Lincoln, Lincoln NE in support of the National Center for Resilient and Regenerative Precision Agriculture (NCRRPA). This project will be executed using a design-bid-build (DBB) project delivery method, which will require the contractor to provide the government with a complete facility and warranty based on the Request for CENWO intends to acquire Construction Services for the NCRRPA HH/GH facility project. Provide a 15,000 GSF Greenhouse and 10,140 GSF Headhouse to be physically connected to the existing Greenhouse Innovation Center (GIC) on the Nebraska Innovation Campus and provide for a future physical connection to a future USDA-ARS Lab/Office Building (LOB) to the east of this project. The Headhouse will be constructed from interior masonry walls for durability and an exterior skin to complement the existing GIC and the future LOB design. Power supply for greenhouse will be within the headhouse and distributed to environmental contact panels located at each zone in the corridor. Water supply will be in the headhouse and distributed to each zone via corridor. The Headhouse will be physically connected to the GIC to prevent winter shock to plants moved between the two structures and to facilitate collaboration. The Headhouse will also be physically connected to the future LOB to facilitate deliveries and movement of research material and USDA-ARS personnel back and forth to the Headhouse and Greenhouse research space Estimated Construction Costs: The estimated construction cost of this project is between $10,000,000 and $25,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects