Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

September 29, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Houston, TX

Subscribe to View Full Documents

Construction of Hike and Bike Trail at Pine Brook Trail Phase 1 for Harris County Precinct 2 UPIN 22102MF2HS01 In the case of a construction project, the successful Bidder or Contractor shall perform all earthwork, construct all surface courses, build all structures and incidental construction, and perform extra Work, if necessary, all-in accordance with the lines, grades, typical cross sections, details and dimensions shown on the Drawings. The Contractor shall furnish, unless otherwise provided in the special provisions or in the Contract, all materials, implements, machinery, equipment, tools, supplies and labor necessary to the prosecution and completion of the Contract. Individual bid bond payable to Harris County for 5% If the successful bidder submits a bank cashiers check as guaranty, Harris County may elect to hold the check until all provisions of the contract have been completed or require the contractor to make a performance and/or payment bond. The performance and/or payment bond shall be in the amount equal to the amount of money to be paid by the County under the contract, unless otherwise stated, and shall be executed by a surety company authorized to do business in the State of Texas. The prescribed performance and/or payment bond application is available to the bidder from Harris County, and is the only form Harris County will accept. Questions Due Date: Jul 21st 2023, 12:00 PM CDT If there are any questions concerning confidentiality of information to be submitted, contact Maria Heinzmann immediately at maria.heinzmann@pur.hctx.net. The project consists of construction of approximately 6,000 LF of concrete trail in Pine Brook Basin in Harris County Precinct 2. The specific scope consists of, but not limited to, the following tasks: - Excavate the existing ground to construct the trail. -Construct the trail and provide connections to existing sidewalks as shown in the construction plans. - Construct reinforced concrete pipe to facilitate drainage. - Provide adequate measures to protect existing trees and to prevent surface water pollution. -Cleanup and site restoration.

72 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.